Home Addition - Construction Update 2

  • Thursday, April 24 2008 @ 10:50 PM UTC
  • Contributed by:
  • Views: 4,011
Dan Stoner and Family

Share
  • Google Plus
  • Facebook
  • Twitter
  • Reddit
  • LinkedIn
  • Digg

We have a new foundation slab!

But first, here are pictures of the extra structural mesh that is now buried in concrete. There are rods inside the old block wall that tie the existing house foundation to the new slab. Concrete was poured inside the existing block wall up to a height of about 10 feet at each of the tie-in locations. These features help with the stability and structural integrity of the slab.





The day of the pour!

The trucks brought concrete to this machine, which pumped it through a large black hose to the site in the back yard:


We had a good view of the activity through our sliding glass doors:





The tallest guy holding the shovel is our contractor, Ivan:








Finally, the finished slab with the forms removed.




We are expecting to see walls going up in early May!
Home Addition - Construction Update 2 | 0 comments | Create New Account

The following comments are owned by whomever posted them. This site is not responsible for what they say.


User Functions

Login

Connect

thatlinuxbox.com is the home of Dan Stoner's Personal Blog, Photos, and More (opinions, rants, techno-babble, and possibly a few useful tidbits of knowledge).

Questions or Comments about this site? Contact danstoner _ at _ gmail.com.

RSS Feed for this blog

Other places to find me on the web:

Twitter

LinkedIn

GitHub

Support This Site

If you like something that you find on this site, please consider making a purchase through one of the links below or sending me an item from my Amazon Wish List.


The Clymb


Awesome VPS hosting by Linode.com