Welcome to thatlinuxbox.com Thursday, November 21 2024 @ 09:38 AM UTC
Home Addition - Construction Update 5
- Thursday, May 08 2008 @ 08:25 PM UTC
- Contributed by: Dan Stoner
- Views: 2,853
The interior walls are being framed today, too.
- Comments (0)
Home Addition - Construction Update 4
- Tuesday, May 06 2008 @ 10:09 PM UTC
- Contributed by: Dan Stoner
- Views: 3,102
More:
- read more (1 words)
- Comments (0)
Home Addition - Construction Update 3
- Saturday, May 03 2008 @ 04:27 PM UTC
- Contributed by: Dan Stoner
- Views: 4,485
The contractors have cut away the existing roof to make room for the new roof connection.
Here is what $500 worth of fill dirt (sand) looks like:
- read more (71 words)
- Comments (0)
Home Addition - Construction Update 2
- Thursday, April 24 2008 @ 10:50 PM UTC
- Contributed by: Dan Stoner
- Views: 4,011
But first, here are pictures of the extra structural mesh that is now buried in concrete. There are rods inside the old block wall that tie the existing house foundation to the new slab. Concrete was poured inside the existing block wall up to a height of about 10 feet at each of the tie-in locations. These features help with the stability and structural integrity of the slab.
The day of the pour!
The trucks brought concrete to this machine, which pumped it through a large black hose to the site in the back yard:
- read more (42 words)
- Comments (0)
Home Addition - Construction Update 1
- Saturday, April 19 2008 @ 08:07 PM UTC
- Contributed by: Dan Stoner
- Views: 3,334
We have passed our first inspection and the foundation will be poured soon!
More:
- read more (11 words)
- Comments (0)