Welcome to thatlinuxbox.com Saturday, October 12 2024 @ 03:01 AM UTC

Home Addition - Construction Update 4

View Printable Version
  • Tuesday, May 06 2008 @ 10:09 PM UTC
  • Contributed by:
  • Views: 3,063
Dan Stoner and Family

Share
  • Google Plus
  • Facebook
  • Twitter
  • Reddit
  • LinkedIn
  • Digg

This thing is going up fast! We have almost all of the walls and openings for doors and windows.



More:

Home Addition - Construction Update 3

View Printable Version
  • Saturday, May 03 2008 @ 04:27 PM UTC
  • Contributed by:
  • Views: 4,419
Dan Stoner and Family

Share
  • Google Plus
  • Facebook
  • Twitter
  • Reddit
  • LinkedIn
  • Digg

More progress!

The contractors have cut away the existing roof to make room for the new roof connection.



Here is what $500 worth of fill dirt (sand) looks like:

Home Addition - Construction Update 2

View Printable Version
  • Thursday, April 24 2008 @ 10:50 PM UTC
  • Contributed by:
  • Views: 3,965
Dan Stoner and Family

Share
  • Google Plus
  • Facebook
  • Twitter
  • Reddit
  • LinkedIn
  • Digg

We have a new foundation slab!

But first, here are pictures of the extra structural mesh that is now buried in concrete. There are rods inside the old block wall that tie the existing house foundation to the new slab. Concrete was poured inside the existing block wall up to a height of about 10 feet at each of the tie-in locations. These features help with the stability and structural integrity of the slab.





The day of the pour!

The trucks brought concrete to this machine, which pumped it through a large black hose to the site in the back yard:

Museum Server Racks - Part 3

View Printable Version
  • Monday, April 21 2008 @ 05:16 PM UTC
  • Contributed by:
  • Views: 6,510
Fun Stuff @ Work

Share
  • Google Plus
  • Facebook
  • Twitter
  • Reddit
  • LinkedIn
  • Digg

We have cooling!



The first server has been installed:

Home Addition - Construction Update 1

View Printable Version
  • Saturday, April 19 2008 @ 08:07 PM UTC
  • Contributed by:
  • Views: 3,319
Dan Stoner and Family

Share
  • Google Plus
  • Facebook
  • Twitter
  • Reddit
  • LinkedIn
  • Digg

We have been very pleased to see workers almost every day!

We have passed our first inspection and the foundation will be poured soon!



More:

Home Addition - Construction Begins!

View Printable Version
  • Saturday, April 12 2008 @ 12:36 AM UTC
  • Contributed by:
  • Views: 3,203
Dan Stoner and Family

Share
  • Google Plus
  • Facebook
  • Twitter
  • Reddit
  • LinkedIn
  • Digg

We have our permits and construction has finally begun! I can't believe we started this project back in 2006 and it is really underway.

Previous posts about our home addition project are Home Addition - New Floor Plan and Home Addition - floor plan.

The addition will be two rooms plus a bathroom for about 600 square feet of new space. We are also getting a new roof and new windows all around (energy efficient vinyl windows from Silver Line).


Here is the "before" picture, where the old aluminum window and the wooden deck are visible:



Our new dining room window has been installed, the heat pump has been moved, and demolition has begun:

User Functions

Login

Connect

thatlinuxbox.com is the home of Dan Stoner's Personal Blog, Photos, and More (opinions, rants, techno-babble, and possibly a few useful tidbits of knowledge).

Questions or Comments about this site? Contact danstoner _ at _ gmail.com.

RSS Feed for this blog

Other places to find me on the web:

Twitter

LinkedIn

GitHub

Support This Site

If you like something that you find on this site, please consider making a purchase through one of the links below or sending me an item from my Amazon Wish List.


The Clymb


Awesome VPS hosting by Linode.com